EasyManua.ls Logo

Iveco DAILY M.Y. 2012 User Manual

Iveco DAILY M.Y. 2012
252 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
DAILY M.Y. 2012
BODYBUILDERS INSTRUCTIONS
LIGHT RANGE
ISSUE 2012

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Iveco DAILY M.Y. 2012 and is the answer not in the manual?

Iveco DAILY M.Y. 2012 Specifications

General IconGeneral
BrandIveco
ModelDAILY M.Y. 2012
CategoryAutomobile
LanguageEnglish

Summary

Bodybuilders Instructions

Section 1 General Specifications

1.1 Aim of the requirements

Details the purpose of the publication, data and instructions for fitting out and converting vehicles for safety and reliability.

1.7 Multi Stage Type Approval - Collaboration

Explains the procedure for multi-stage type approval and the responsibilities of IVECO and the Bodybuilder.

1.10 Prevention of accidents

Provides guidelines for preventing accidents, including safety precautions for personnel and vehicle structures.

1.15 Dimensions and masses

Covers vehicle dimensions, permitted weights on axles, chassis weighing, and body conversion considerations.

1.16 Instructions for correct operation of vehicle components and accessibility

Specifies requirements for maintaining component operation, accessibility, and safety during conversion.

Section 2 Chassis Modifications

2.1 General standards regarding changes to the chassis

Provides fundamental rules for chassis modifications, including welding, drilling, and screw usage.

2.4 Modification of the wheelbase

Covers the process of modifying the vehicle's wheelbase, including authorization and influences on steering.

2.11 Operations on the suspensions

Explains operations on suspensions and springs, including safety concerns and transformations.

2.13.5 Occupant protection

Focuses on occupant protection, covering airbags, safety belt attachments, and seats.

2.15 Work on the brake system

Covers all aspects of working on the brake system, including piping, correctors, and ESP systems.

2.15.3 ESP (Electronic Stability Program)

Explains the ESP system, its components, and parameters relevant for control unit programming.

Section 3 Fitting superstructures

3.1 Construction of the subframe

Provides general instructions for constructing the subframe, including material selection and dimensions.

Section 4 Power Take Offs

4.1 General specifications

Covers general specifications for Power Take Offs (PTOs), including types, applications, and power calculations.

4.2 Power Take Off from gearbox

Details Power Take Offs from the gearbox, including maximum torques and PTO ratios.

4.6 PTO management

Covers PTO management, including original equipment options and control panel functions.

Section 5 Special instructions for electronic subsystems

5.1 Electronic system

Shows the location of electronic control units and connectors that can be installed on the vehicle.

5.2 Bodybuilder connectors

Details specific connection points provided for supplementary systems to interface with the vehicle's electrical system.

5.3 Electronic control units

Covers precautions for handling installed electronic control units (ECUs) to prevent damage.

5.4 Electrical system: modifications and drawing-off power

Details modifications to the electrical system and drawing power for auxiliary systems.

Appendix A Daily PASSENGER TRANSPORT

A.3 Building the bodywork

Offers instructions for assembling the bodywork, covering technical aspects and regulations.

A.7 Road tests

Outlines checks and parameters to be verified during road tests for vehicle functionality and safety.

Appendix B Daily CNG and CNG with Recovery Mode

B.1 General information

Provides general information on Natural Gas (CNG) composition, vehicle systems, and conversion considerations.

B.2 Safety rules

Details critical safety rules for refuelling, handling gas leaks, and responding to fire incidents.

B.2.1 During refuelling

Provides safety guidelines for refuelling natural gas, including precautions against frostbite and fire.

B.2.2 In the event of leaks

Outlines safety measures to take in case of gas leaks, emphasizing explosion danger and ventilation.

B.2.3 In case of fire

Provides procedures for handling gas fires, focusing on cooling, closing valves, and contacting emergency services.

B.3 Operations on the system

Covers general warnings and procedures for operations on the fuel system components.

B.3.5 Emptying the gas system

Details procedures for emptying the gas system, including partial and complete methods and safety precautions.

B.3.6 VBE solenoid valve replacement

Provides instructions for removing and replacing VBE solenoid valves, emphasizing replacement of removed solenoids.

B.4 Cylinders

Covers information regarding CNG cylinders, including their storage, connection, and identification markings.

B.4.2 Cylinder replacement

Details the removal and refitting procedures for CNG cylinders.

B.7 Power Take Off

Describes PTO engagement and disengagement procedures for CNG vehicles, similar to diesel engines.

Related product manuals