EasyManua.ls Logo

JBL Project K2 S9800 - Chapter 4: Unpacking the Project K2 S9800 System; Packaging and Handling; Foot and Coaster Installation

JBL Project K2 S9800
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 4
Unpacking the Project K2 S9800
S y s t e m
All components of the P roject K2 s y s-
tem have been very carefully packed
for maximum protection against dam-
age.
As with any superior audio product, it
is advisable to keep the original pack-
ing materials in case it is necessary to
transport the P roject K2 S9800 s y s t e m .
Because of the bulk and weight of this
l o u d s p e a k e r, at least two people are
required to unpack it in the following
manner: open the box, push back the
flaps, and then slowly and carefully roll
the loudspeaker and its contents over
onto a well protected surface such as a
thick carpet; lift off the box.
Two choices of feet, spiked and round-
ed are provided. Please s e e Fi g u re 6,
and thread either type of foot onto the
bottom of the K2 S9800 in four loca-
t i o n s .
Four metal coasters are also provided.
These are to be placed between the foot
and the floor should further protection
of the floor coverings be required.
11
Project K2 S9800
K2 manual v11 approved 12/4/01 12:10 PM Page 11

Related product manuals