EasyManuals Logo

jcb JS200 Service Manual

jcb JS200
531 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #468 background imageLoading...
Page #468 background image
7 - 2
Dismantling (continued)
3. Counterbalance valve disassemble
Loosen (2-6-5) socket head bolt and remove the
(2-6) cap.
Note: Since the cap is loaded by a spring, loosen the socket
head bolt halfway and while pressing the cap by hand,
remove the socket head bolt.
4. Remove (2-5) spring seat, (2-4) spring and (2-3)
spring seat.
5. Pull out the (2-2) plunger assembly.
While turning the plunger, pull it out slowly, being
careful not to damage the outer circumference.
6. 2-speed control valve disassembly
a. Loosen (2-14) (2-17) plugs and remove (2-9) valve
assembly, (2-13) spring, (2-16) spring guide.
While turning the (2-9) valve assembly, pull it out
slowly.
Be careful not to damage the outer circumference.
Section F
Transmission
9803/6400
Section F
7 - 2
Issue 1
Motor

Table of Contents

Other manuals for jcb JS200

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the jcb JS200 and is the answer not in the manual?

jcb JS200 Specifications

General IconGeneral
Brandjcb
ModelJS200
CategoryExcavators
LanguageEnglish

Related product manuals