EasyManua.ls Logo

jcb RTFL 926 - Cleaning the Machine

jcb RTFL 926
200 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Routine Maintenance
Service Schedules
98 98
9811/5700-7
Beacon - Operation (if fitted) - Check

Heater - Operation - Check

Warning Lights/Audible Alarm - Check

Lights and Instruments - Check

Operational Lights - Check
 
Horn - Operation - Check
 
Reverse Alarm - Check
 
All Other Equipment (as fitted) - Check

BODYWORK AND CAB
Teeth and Side Cutters (if fitted) - Check Security

Glazing for Correct Fit - Check

Doors and Hinges - Fitment/Leaks - Check

Locks and Keys - Check

ATTACHMENTS
Attachment Operation - Check

Circuit Pressures - Check

LIFTING EQUIPMENT
Fit for Purpose Test
(4)
- Complete

(1) First 100 Hours Service only, to be completed by your JCB Distributor.
(2) Jobs which should only be done by a specialist.
(3) Fully raise and lower the mast daily to lubricate the cylinder bores and cylinder rods.
(4) This may be required every six months or at least annually in some countries to meet and comply with legislation and
for insurance purposes.
Operation 10 50
100
(1)
500 1000 2000 6000

Table of Contents

Related product manuals