Page 10 of 28
Technical Support tac@jdsu.com 1 866 228-3762
Systems Engineer Dave.Baker@jdsu.com 321-243-0600
21. View Summary Select the Summary tab to view status of all tests. Verify that all tests
PASS and the displayed values meet the performance objectives of the
line under test.
22. Exit Tap [Exit] to return to the main Results view.
23. RFC-6349 If the Z-side test equipment is a T-BERD 6000A and both units are
equipped with the LAYER4 TCP Wirespeed option, proceed to section 3.