4
II. INITIAL INSPECTION
Carefully unpack the instrument and accessories. Inspect for
damages made in shipment. If any damage is found, notify your
Jenco representative immediately. All packing materials should be
saved until satisfactory operation is confirmed.
MOUNTING PROCEDURE
1. Make a cutout on any panel,
with a thickness of 1/16 in. (1.5
mm) to 3/8 in. (9.5mm).
2. Remove the mounting
assembly from the controller
and insert the controller into
the cutout.
3. Replace the mounting bracket
assembly onto the controller
and secure the controller to
the mounting panel.
Warning :
If the equipment is used in a manner not specified by the
manufacturer, the protection provided by the equipment may be
impaired.
Cleaning the instrument :
1. Be sure to remove the power before attempting to clean the
meter.
2. Use a lint free cloth and clean water or neutral detergent.
3. Wipe the outer surface of the instrument only.
4. Wipe dry the instrument before power again.