EasyManua.ls Logo

JMPosner SQ1 - Maintenance and Repair

Default Icon
23 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
CHANGING THE BEARING HOUSING SQ2 - SQ3
1. Placethebowlupsidedownontheatsurface.
2. TurntheAllenkeyanticlockwiseandremovethe3bolts,(allenkeysprovided)
3. Removetheoldhousingandplacebackintheboxthenewhousingwassentinand
returntoJMPosnerLTD.
4. Cleanthebasinthoroughly(removeanyGreaseorchocolate)
5. TakethenewHousingandMatchthehole“A”onthehousingtothe“A”markingon
theBasin.
6. Handtightenall3boltsrst.
7. WiththeAllenkeyturnclockwiseuntiltight.

Related product manuals