5.0 Raising the Jack Beam
1. Prior to placing vehicle on lift, check the operation of the Jack Beam.
2. Press the "PUMP" end on the air/hydraulic pump and hold until jacking Beam is
at full working height.
3. As lift travels up:
Ensure the mechanical safety falls into place at all safety positions.
Check system for air and hydraulic leaks.
4. To place a vehicle on the lift, see section “8.0 Positioning of Vehicle on Jack
Beam” for instructions.