EasyManua.ls Logo

JumpPro Xtra - Page 12

Default Icon
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STEP 4: FITTING THE FRAME PAD
9. Start by laying the corner sections of the frame
pad (A1) over the corners of the top rail with the ties
facing downwards. Once you have completed this
step, lay the middle sections of the pad (A2) over the
exposed middle sections of the top rail. Connect the
sections together with the attached velcro strips.
Align the holes in the frame pad with the connectors
on the frame.
10. Tie all the black straps to the top rails. Do not
tie them to the springs.
The trampoline pad is now fitted and you have
completed step 4.
WARNING: The trampoline MUST NOT be used
during construction.
STEP 5: ASSEMBLING THE ENCLOSURE POLES
11. Separate the bottom enclosure tubes (P)
from the top enclosure tubes (R). The
bottom enclosure tubes have square
connectors at the bottom. Using the self
tapping screws (Y6) connect the bottom
enclosure tubes (P) with the bent upper pole
tubes (R), screw (Y3) the pole caps (S) at
the top of each enclosure top pole.
Complete by covering each pole with a PVC
sleeve (X)..
11

Related product manuals