Table 53: Site Preparation Checklist (continued)
NotesDatePerformed ByItem or Task
Plan the rack location, including required space
clearances.
Secure the rack to the floor and the building
structure.
Acquire appropriate cables and connectors.
Site Preparation Checklist 113