Do you have a question about the Katadyn Spectra Catalina 340C and is the answer not in the manual?
Defines operational modes like Auto Store, Fill Tank, and Auto Run.
Key considerations and requirements for installing the Catalina 340c system.
Guidance on selecting and installing the sea water intake thru-hull fitting.
Instructions for properly sealing and assembling pipe fittings using Teflon tape.
Guidelines for selecting appropriate wire gauge and adhering to electrical standards.
Description and mounting advice for the sea strainer and boost pump.
Details on the fresh water flush module's function, location, and components.
Information on mounting the feed pump module, considering clearance and ventilation.
Instructions for mounting and connecting the remote control panel.
Details on the Clark Pump and membrane module installation, temperature, and access.
Guidance on selecting appropriate circuit breaker sizes and wire gauges for the system.
Instructions for installing the float switch to automate tank filling.
Guide for installing a tank low float switch to enable Auto Fill mode.
Procedure for initial system startup, purging, and testing.
Steps to calibrate the prefilter condition based on system installation.
Steps to calibrate the optional tank level sensor for accurate readings.
Explains Fill Tank and Auto Run modes for water production.
Describes the function of automatic flushing and system protection during idle periods.
Guidance on servicing pre-filter elements based on condition and usage.
Procedures for diagnosing and fixing leaks in high-pressure fittings.
Information on membrane susceptibility to fouling and damage, and testing for issues.
Options for adjusting LCD brightness, system units, and factory reset.
Configuration of system faults and shutdown alarms to prevent damage.
Accessing advanced settings, recommended for trained technicians only.
Exploded view and part numbers for the high-pressure module assembly.
Steps and required information for submitting a warranty claim.
Checklist items for verifying the inlet seacock and thru-hull installation.
Section for technician and distributor signature and date.
Checklist for verifying the purge sequence, valve positions, and calibration.
Checks for product flow, quality, pressure, and boost pump operation.
List of topics the owner should be trained on for proper operation and maintenance.
| Power Source | 12V DC |
|---|---|
| Voltage | 12 V DC |
| Technology | Reverse osmosis |
| Membrane Life | 3-5 years |
| Operating Pressure | 800 psi (55 bar) |











