EasyManua.ls Logo

Keller minimal windows 4+ - Inside Sealing of the Outer Frame; 8.1 EPDM Sealing Procedure

Default Icon
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
Keller minimal windows
®
Keller minimal windows
®
4+ 08
On-site installation | 997-000120 | 07-2021
8. Inside sealing of the outer frame
8.1
The inside EPDM sealing (500 mm or 700 mm available) is
to be carried out as follows - see red arrow & dashed line
Cleaning and dusting of building
surfaces.
EPDM foil must be be fixed with
contact adhesive.