EasyManua.ls Logo

Kioti KL155 - Post-Installation Checks and Lubrication

Kioti KL155
108 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STEP 12.
Grease every fitting.
See page 9-3 for the grease chart.
STEP 13.
Hydr. oil level check.
- Lower the boom on the ground and retract the bucket
cylinder.
- Add the hydraulic oil up to the "Full" mark on the oil
gauge.
- Specification of oil: Refer to the tractor manual.
STEP 14.
In order to check the leakage of hydraulic oil. please
operate the Loader 5 times or more with carefully.
14
INSTALLATION INSTRUCTIONS 14-5

Related product manuals