EasyManua.ls Logo

Klargester BIODISC BF - Loss of Rotation Alarm System; Initial Start Up Procedures

Default Icon
15 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GL0014K Owners Handbook BioDisc BD, BE, BF, BG, ND, NE, NF, NG
Page 8
Optional Loss of Rotation Alarm
The alarm sensor (reed switch) is mounted
adjacent to the motor/gearbox assembly. The
sensor may be supplied out of position, to allow for
possible minor rotor movement during transport.
Check the sensor position and if necessary adjust
to provide a gap of 5 - 10 mm between the sensor
and the actuator magnet.
- Alarm Sensor Adjustment
(position may vary)
3. Independent Remote Alarm Panel. This is fitted
in addition to the Standard Control Panel, and is
suitable for any indoor location, up to a maximum
of 100 metres from the BioDisc. It would usually
be connected to a power supply independent of
the BioDisc, and works in a similar manner to the
Alarm Control Panel. It has an audible alarm,
with mute button and a warning light.
SECTION 3 INITIAL START UP PROCEDURE
(1) INTRODUCTION
Every care is taken to ensure that all mechanical components are correctly fitted, adjusted
and lubricated prior to leaving the factory. However, subsequent handling during
transportation and installation may result in the movement of components and a subsequent
need to re-adjust prior to starting the unit. If on inspection, you consider that any
components require adjustment, please contact Klargester to request a commissioning
service.
Once the unit has been installed it should be left filled with water. Please switch on the
motor, following the procedure below and leave the unit running, even if there is no sewage
being fed into the plant. If the unit has been installed with no operational power supply, then
remove the motor/gearbox unit and store it in a dry or heated environment until such time as
the unit is ready for permanent operation. The motor/gearbox unit should then be replaced
and the chain tensioned by Klargester.
We recommend that the system should be commissioned by Klargester; details on request.
Where an immediate start-up is necessary, the following basic procedures should be carried
out. Ensure that all Health and Safety precautions are observed.
(2) WATER Check that the BioDisc is full of water to the outlet level.
(3) ELECTRICAL Check that the power supply is connected to the control panel. Check
that all electrical components and conductors are earthed.

Related product manuals