EasyManua.ls Logo

Klarstein BAROSSA 29D - Installation; Start Operation

Klarstein BAROSSA 29D
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
EN
INSTALLATION
Position
Do not turn the appliance more than 45°when moving it into position.
The appliance must be put on a at, rm & dry oor or similar noncombustible pad;
do not use the foam pad used in the packaging.
Do not put the appliance where it is wet.
Do not use the appliance where it will freeze.
Do not use the appliance outdoors in case of direct sunlight or rain.
Wine bottles can be stored when you feel like cooling off inside. The appliance will
operate after around 1 hour.
START OPERATION
1. Cleaning the compartment
Before powering the appliance on, clean the inside of the appliance and check the
drainage pipe is properly connected. (For further details, please refer to “Maintenance
and cleaning”.)
2. Let the appliance stand
Before powering it on, place the appliance on a level, rm & dry oor for at least
30minutes.
3. Power on
The appliance can now be switched on and will have sufciently cooled down inside
after 1 hour, otherwise you should check the power connection.

Related product manuals