EasyManua.ls Logo

Klarstein FIJI FLOW SMART - Installaton

Klarstein FIJI FLOW SMART
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
EN
INSTALLATON
Installation prepraton
To prevent personal injury and
damage, ensure that the hanging
location allows the blades a
clearance of 2.3m from the
oor and 76cm from any wall or
obstruction.
Be sure the outlet box is securely
attached to the building structure
and can support the full weight of
the fan.
Preparing the Fan Site
Downrod Installation
This fan can be mounted with a downdrod on a normal or vaulted ceiling.
The hanging length can be extended by a longer downdrod.
Installation requires these tools: Screwdriver, at-head screwdriver, adjustable
pliers or wrench, stepladder, wire cutters, and rated electrical tape.
20°
76 cm
from wall
or nearest
obstructions
2.3 m
blades to oor
Standard Mounting hangs from the
ceiling by a downrod
Angled Mounting recommended for
a vaulted or angled ceiling.
support brace
support brace

Related product manuals