4.1.1 Service Schedule, 6VSG Models
System Component or Procedure
Flexible lines and connections
Main tank supply level (if LPG fueled)
Oil level, with oil makeup kit
Change oil and filter (Kohler PRO 10W-50 oil and
Kohler PRO filter only)
Change oil (conventional oil)
Replace filter (standard filter- non-pro filter)
Obstructions or combustible materials near exhaust
outlet
Battery charger operation, charge rate (if equipped)
Remove corrosion, clean and dry battery and rack
Clean and tighten battery terminals and inspect boots
Battery electrolyte level and specific gravity *
Tighten control and power wiring connections
Remote control system (if equipped)
Wire abrasions where subject to motion
Wire-cable insulation condition
Air cleaner and precleaner service †
Replace stepper motor coupling and bushing
Brushes and collector ring
Measure and record resistance readings of windings
with insulation tester (Megger
®
, with SCR assembly or
rectifier and load leads disconnected)*
General Condition of Equipment
Evidence of vibration, leakage, excessive noise,
temperature, or deterioration
Interior of sound enclosure
* Not necessary for maintenance-free batteries.
† Service more frequently under extremely dusty/dirty conditions.
D Authorized distributor/dealer only
Megger
®
is a registered trademark of Biddle Instruments.