EasyManua.ls Logo

Kohler Command PRO ECV630 - Page 91

Kohler Command PRO ECV630
152 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.17
Section 7
Electrical System and Components
7
Test 4. Solenoid Hold-In Coil/Contact Continuity.
Use an ohmmeter set to the audible or Rx2K scale, and
connect the two ohmmeter leads to the two large post
terminals. Perform the preceding test (3) and check
for continuity. See Figure 7-40. The meter should
indicate continuity, if no continuity is indicated the
solenoid should be replaced. Repeat test several times
to con rm condition.
Figure 7-40. Testing Hold-In Coil/Solenoid Contact
Continuity.
Plunger
Pushed “In”
VOM Meter
Leads
12 volt Test Leads

Related product manuals