71
Reassembly
16 690 01 Rev. -- KohlerEngines.com
Connect Spark Plug Leads
Connect leads to spark plugs.
Prepare Engine for Operation
Engine is now completely reassembled. Before starting
or operating engine, be sure to do following.
1. Make sure all hardware is tightened securely.
2. Make sure oil drain plug, Oil Sentry
TM
pressure
switch, and a new oil fi lter are installed.
3. Adjust carburetor idle speed adjusting screw as
necessary.
Testing Engine
It is recommended engine be operated on a stand or
bench prior to installation in piece of equipment.
1. Run engine at idle for 2-3 minutes, then 5-6 minutes
more between idle and midrange.
2. Adjust idle speed screw and high-speed stop as
necessary. Make sure maximum engine speed does
not exceed 3750 RPM (no load).