EasyManua.ls Logo

Kohler K-1976 - Page 3

Kohler K-1976
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Before You Begin (cont.)
Shut off the main water supply.
The supply location is not standard. Install the supply following
the rough-in diagram.
Observe all local plumbing and building codes.
Kohler Co. reserves the right to make revisions in the design of
products without notice, as specified in the Price Book.
Kohler Co. 3 1052867-2-B

Related product manuals