EasyManua.ls Logo

Kohler K-4108 - Using the Manual Controls; A. [stop]; B. [dryer]

Kohler K-4108
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Install the Docking Station
Position the back plate at the desired mounting location.
Confirm the back plate is level.
Using a pencil, mark the two mounting hole locations. Set the
back plate aside.
For installation into a stud or other wood surface: Drill a 1/16
hole at each of the marked locations.
For installation using wall anchors: Drill a 1/4 hole at each of
the marked locations. Install the wall anchors into the holes.
Remove the adhesive strip cover on the back plate.
Position the back plate over the anchors or marks, adhesive side
toward the wall. Secure the back plate with the screws.
Open the battery compartment. Install four AA batteries in the
compartment in the back of the docking station.
Position the docking station on the back plate.
Position the remote control on the docking station.
1/16"
or 1/4"
Holes
Back Plate
Remote Control
Docking Station
Batteries
Kohler Co. 7 1194356-2-A

Other manuals for Kohler K-4108

Related product manuals