EasyManua.ls Logo

Kohler MAGNUM M18

Kohler MAGNUM M18
139 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PREPARE
THE
ENGINE
FOR
OPERATION
The
engine
is
now
completely
reassembled.
Before
Operating
the
engine,
be
sure
to
do
the
following:
C)
Make
sure
ali
hardware
is
tightened
securely
and
oil
drain
plugs
are
installed.
O
Fill
the
crankcase
with
the
correct
amount,
weight,
and
type
of
oil,
Refer
to
the
oil
recommendations
and
procedures
in
the
"Safety
and
General
Infor-
mation"
and
"Periodic
Maintenance"
Sections.
D
Adjust
the
carburetor
main
fuel
needle,
idle
fuel
needle,
or
idle
speed
adjusting
screw
as
neces-
sary.
Refer
to
the
“Fuel
System
and
Governor"
section.
D
Make
sure
the
maximum
engine
speed
does
not
exceed
3600
RPM.
Adjust
the
high
speed
stop
as
necessary.
Refer
to
the
"Fuel
System
and
Govemor"
Section.
SECTION
11
REASSEMBLY
TESTING
THE
ENGINE
It
is
recommended
that
the
engine
be
operated
on
a
test
stand
or
bench
prior
to
installation
in
the
piece
of
equipment.
1.
Set
the
engine
up
on
a
test
stand.
Install
an
oil
pressure
gauge
in
the
location
normally
used
for
Oil
Sentry".
Refer
to
"Lubrication
System"
Sec-
tion,
Figure
6-4.
Start
the
engine
and
check
to
be
certain
that
oil
pressure
(20
psi
or
more)
is
pres-
ent.
Run
the
engine
for
5-10
minutes
between
idle
and
midrange.
Adjust
the
carburetor
mixture
settings
as
necessary.
2.
Make
sure
the
maximum
engine
speed
does
not
exceed
3750
RPM
(no
load).
Adjust
the
throttle
and
choke
contrals
and
the
high
speed
stop
as
necessary.
Refer
to
the
“Fuel
System
and
Gover-
nor”
Section.
11.19

Related product manuals