EasyManuals Logo

Komatsu PC12R-8 Service Manual

Komatsu PC12R-8
208 pages
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #208 background imageLoading...
Page #208 background image
206
ARRANGEMENT FOR THE INSTALLATION OF THE DEMOLITION HAMMER (BREAKER)
6.2.3.2 REMOVING THE HAMMER
6.2.4 MAINTENANCE
To remove the hammer, proceed as follows:
1 - Stop the engine and move the hydraulic controls in all directions, in order to completely release the residual
pressures present in the circuits of the machine.
2 - Press the hammer control pedal to release the residual pressure present in the hammer delivery pipe.
3 - Slowly loosen the hydraulic oil filling cap to release the residual pressure from the tank.
4 - Disconnect the hammer feeding and draining pipes.
5 - Fit the sealing plugs of the rapid couplings.
6 - Disconnect the hammer from the mechanical constraints, as described in 3.13.4 CHANGING THE BUCKET.
The hydraulic system does not require any maintenance operation and inspection other than those prescribed for
the machine.
For the maintenance operations required for the hammer, see the specific operation manual.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Komatsu PC12R-8 and is the answer not in the manual?

Komatsu PC12R-8 Specifications

General IconGeneral
BrandKomatsu
ModelPC12R-8
CategoryExcavators
LanguageEnglish

Related product manuals