E-1
A0Y5961111
INSTALLATION MANUAL
950
<Important>
Be sure to correctly follow the procedures in order as explained in this Installation Manual.
If you do not follow the procedure in order, the image trouble may occur.
I. Installation space (Unit: mm)
<Main body + Finisher +LU>
Machine weight: Approx. 285 kg
II. Confirmation prior to installation
1. Select a flat and stable place that can sustain the
machine’s weight.
2. Confirm that the voltage and the frequency meet
the product specifications, and that the current
capacity of the outlet meets or exceeds the
capacity specified.
3. Connect the machine directly to a dedicated
power outlet. (Do not use an extension cord.)
4. Do not plug or unplug the power cord with a wet
or dirty hand. (May cause an electrical shock.)
5. Do not install the machine in a place with high
temperatures or high humidity, or in direct sun-
light.
6. Do not install the machine in a dusty place, and/
or near volatile flammable substances.
7. Do not install the machine in a poorly ventilated
place.
III.
How to bring down the machine onto the floor
1. Using the spacers and the spanner, lower the
adjuster feet and remove the cushions.
2. Raise the adjust feet again, to let the machine
descend onto the pallet. In this case, be sure to
extremely raise the adjuster feet.
* Be sure to work on the above procedure in succession,
respectively for the right side and left side of the machine.
3. Fix the veneer with its beveled portion turned
upward, to the right end face of the pallet by two
nails as illustrated below.
4. Set the 2 cushions removed from the machine,
below the veneer as illustrated below.
980 295675
150
116
435
2066
1603
2366
1420
690
990
1203
183
150
410 840
A0Y5IXC038CA
1930
780
950
200
A0Y5IXC039CA
A0Y5IXC033CA
Spanner
Spacers
57AEIXE044SA
Corrugated fiberboard
Nail: 2 pcs.
Veneer
57GEIXE043SA
Cushions
Corrugated fiberboard
Veneer
Cushions
Applied Machine:
950