EasyManua.ls Logo

Labounty MSD 2250 - Periodic Inspection Checklists

Default Icon
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22 | MSD Legend Series Operation & Maintenance Manual
80-HOUR INSPECTION CHECKLIST
Build-up, hard-surfacing & Blade Rotation
________ Build-up jaws and hard surface, if necessary (See “Jaw Build Up & Hardsurfacing” on page 38).
________ Check wear plates and bars. Replace if necessary (see “Replace Wear Plates & Bars” on page 41).
________ Inspect slide screw (see “Slide Screw Adjustment” on page 41).
________ Rotate blades (see “Blade Rotation” on page 31). Record which rotation you performed.
________ First Rotation ________ Second Rotation ________ Third Rotation ________ Fourth Rotation
________ Inspect the cylinder gap (see “Check the Cylinder Gap” on page 42).
Inspected By: _______________________________________________ Date:_____________________
1500-HOUR INSPECTION CHECKLIST
________ Replace rotation bolts (see “Inspect / Torque Bolts” on page 25 for proper bolt size and class).
Inspected By: _______________________________________________ Date:_____________________
2,000- HOUR INSPECTION CHECKLIST
Replace Select Seals
________ Replace cylinder seals.
________ Replace swivel manifold seals, if equipped.
Inspected By: _______________________________________________ Date:_____________________

Related product manuals