LAGOON 421
3
LAUNCHING
33
• AFTER MAST INSTALLATION
- Lubricate all the bottle screws (see recommendations in the RIG-
GING chapter)).
- Stretch tightly the rigging (refer to RIGGING chapter for settings).
- Reconnect the electrical cables in the junction box at the base of
the mast located in the forward cockpit locker after running the ca-
bles through the gooseneck located at the front of the mast (see
ELECTRICITY chapter).
- Carefully check the tightness of the turnbuckle cotter pins,and pro-
tect with adhesive tape.
- Put the boom back. Refit all ropes.
• UNSTEPPING THE MAST
Proceed by carrying out the operations recommended for stepping
the mast in reverse order,taking care to mark the line locations with
stickers.
RECOMMENDATION
Adjust the mast after a few trips.
RECOMMENDATION
Before all dismasting operation, remember to disconnect
the electric cables
Pull gently while guiding the cables.
LAUNCHING