7
MACHINE INSTALLATION AND INSPECTION
When installing and inspecting HYPERshoot, be very careful of the following points and pay
attention to ensure that the players can enjoy the game safely.
• Be sure to turn the power OFF before working on the machine.
• Make sure the power cord is not exposed on the surface (floor, ground, etc.) where people walk.
• Check that the rubber glide feet levellers are set correctly on the floor so that the game cabinet
is level and stable.
• Always make complete connections for the integrated circuit (IC) logic PC Boards and other
connectors. Insufficient insertion can damage the electrical components.
• Only qualified personnel should inspect or test the integrated circuit (IC) logic PC Boards.
• If any integrated circuit (IC) logic PC Boards should need servicing, please contact the nearest LAI
Games Distributor (refer to the back page of this manual).
WARNING: Always turn OFF mains power before removing safety covers and refit all safety
covers when work is completed.