EasyManua.ls Logo

Lancaster 7-LWT-UV009 - Water Chemistry and Installation; Water Chemistry Recommendations; Installing Your UV Disinfection System

Lancaster 7-LWT-UV009
13 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PAGE 6
Water Chemistry:
Water quality is extremely important for the optimum performance of your UV system. The following levels are
recommended for installation:
•Iron:<0.3ppm(0.3mg/L)
•Hardness*:<7gpg(120mg/L)
•Turbidity:<1NTU
•Manganese:<0.05ppm(0.05mg/L)
•Tannins:<0.1ppm(0.1mg/L)
•UVTransmittance:>75%(callfactoryforrecommendationsonapplicationswhereUVT
<75%)
*Where total hardness is less than 7 gpg, the UV unit should operate efciently provided the quartz sleeve is cleaned
periodically. If total hardness exceeds 7 gpg, the water should be softened. If your water chemistry contains levels in
excess of those mentioned above, proper pre-treatment is recommended to correct these water problems prior to the
installation of your UV disinfection system. These water quality parameters can be tested by your local dealer, or by
most private analytical laboratories. Properpre-treatmentisessentialfortheUVdisinfectionsystemtooperateas
intended.
InstallingyourUVDisinfectionSystem:
•CAUTION, electronic ballast must be connected to a grounded receptacle. A ground fault protected circuit (GFCI) is
recommended.
• The disinfection system is designed to be mounted either horizontally or vertically at the point-of-use or point-of-entry
depending on the specic ow rate of the unit. NOTE: The ideal installation is vertical with the lamp connector on top.
This is to prevent water damage from occurring on the lamp connector and lamp pins. Leave space at least equal to the
overall length of the disinfection system to allow clearance for the removal and replacement of the lamp and/or quartz
sleeve.
• The electronic ballast should be mounted either above or beside the stainless steel UV reactor chamber. Never mount
ballast vertically with AC connector at top of ballast to prevent moisture from running down cordage and causing a
potential re hazard. Drip loops in all cordage connected to ballast is highly recommended.
• The complete water system, including any pressure or hot water tanks, must be sterilized before start up by ushing with
chlorine (household bleach) to destroy any residual contamination (see page 8).
• The disinfection system is intended for indoor use only. Do not install disinfection system where it may be exposed to the
weather. Protect system from freezing temperature.
• Refer to specications page for ambient conditions and maximum operating pressure.
• Install the disinfection system on cold water line only.
• If treating the entire house, install the disinfection system before any branch lines.
A 5 micron sediment lter must precede the disinfection system. Ideally, the disinfection system should be the last
treatment the water receives before it reaches the faucet.
Click to buy NOW!
P
D
F
-
X
C
H
A
N
G
E
w
w
w
.
d
o
c
u
-
t
r
a
c
k
.
c
o
m
Click to buy NOW!
P
D
F
-
X
C
H
A
N
G
E
w
w
w
.
d
o
c
u
-
t
r
a
c
k
.
c
o
m

Related product manuals