8
StandardGridConnectSystem
WARNING:
TheInverteroutputisconnectedtomainselectricity,thusitisimportantthatall ACwiringcomplies
withtherequirementsoftherelevantwiringstandards,(AS3000, AS4777).
Anyworkcarriedouton AC/MainswiringistobeperformedbyQualified AndLicensed
personnelonly.
PV Edge
SolarPanels
Grid Mains
Switchboard
Power
Power
Lights
Lights
Hot Water
Stove
AirCon
(Exampleonly)
10A
Legend
=CircuitBreaker
ExportMeter
Import
Meter
DIP SWITCHSETTINGS
Switch1-MPPT/Batterymode
Switch2-50/60Hz
Switch4
Switch5
Switch6
IntheONposition theMaximumPowerPoint Trackingisenabled.
ThisisrequiredwhentheDCinputisPhotovoltaicSolarModulesonly.
IntheOFFpositiontheMaximumPowerPoint Trackingisdisabledandthe
voltagetrackingwilloperateatafixedvoltageof54V(PVE1200)or108V
(PVE2500). Thissettingisrequiredinasystemwherea48V(PVE1200)or
96V(PVE2500)BatteryBankisrequiredontheDCinput.
IntheONpositiontheInverterissetfor60Hzoperation.
IntheOFFposition theInverterissetfor50Hzoperation.
MustbeinOFFposition fornormaloperation. TheONpositionis
afactory ACtestsetting.
MustbeintheOFFposition fornormaloperation. TheONposition
isafactoryDCtestsetting.
Notused.
(default)
(default)
(default)
(default)
(default)
Switch3
Batterytypeselectornotusedifswitch1isON.
ON=Gel/SLA battery.
OFF=Floodedbattery.
13
DIP SWITCHLOCATION
MAINPCB
DIP SwitchlocatedonMainPCB
123456
OFF
ON
WARNING:
Duetodangerousvoltagesexistinginsidetheunit,makesure
theDCcircuitbreakerand ACsolarisolatorareturnedoff
beforeopeningtheunit.Only are
permittedtoadjustthesesettings.
qualifiedTradesPersons