EasyManua.ls Logo

Lauda PD 4 R - User Manual

Default Icon
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Operating Instructions
Puridest Distillation Apparatus
PD 2 R, PD 4 R, PD 8 R, PD 12 R
DOMINIQUE DUTSCHER SAS

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Lauda PD 4 R and is the answer not in the manual?

Summary

Distillation Apparatus Usage

Intended Use

Describes the primary purpose and capabilities of the LAUDA Puridest Distillation Apparatus.

Improper Use Scenarios

Outlines unsafe or incorrect applications and environments for the distillation apparatus.

Installation and Location Guidelines

Mains Power Connection

Water Connections Overview

Apparatus Initiation Procedures

Pre-Start Water Filling

Instructs on manually filling the boiler with water before the initial power-on.

Functional Description of Operation

Maintenance, Service, and Troubleshooting

Descaling Procedure

Provides instructions for removing scale buildup from the boiler using appropriate agents.

Pilot Lamp Fault: Back Water

Re-initiation After Low Water

Technical Data: PD 2 R and PD 4 R

Technical Data: PD 8 R and PD 12 R

Mains Connection and Fuses

Mains Connection Examples: PD 2 R;PD 4 R (230 V)

Mains Connection Examples: PD 2 R;PD 4 R (400 V)

Mains Connection: PD 8 R (230 V;1~ to 220 V;3~)

Mains Connection: PD 8 R (230 V;1~ to 400 V;3~)

Mains Connection: PD 8 R;PD 12 R (220 V;3~)

Mains Connection: PD 8 R;PD 12 R (220 V;3~ CEE)

Mains Connection: PD 8 R;PD 12 R (400 V;3~)

Summary

Distillation Apparatus Usage

Intended Use

Describes the primary purpose and capabilities of the LAUDA Puridest Distillation Apparatus.

Improper Use Scenarios

Outlines unsafe or incorrect applications and environments for the distillation apparatus.

Installation and Location Guidelines

Mains Power Connection

Water Connections Overview

Apparatus Initiation Procedures

Pre-Start Water Filling

Instructs on manually filling the boiler with water before the initial power-on.

Functional Description of Operation

Maintenance, Service, and Troubleshooting

Descaling Procedure

Provides instructions for removing scale buildup from the boiler using appropriate agents.

Pilot Lamp Fault: Back Water

Re-initiation After Low Water

Technical Data: PD 2 R and PD 4 R

Technical Data: PD 8 R and PD 12 R

Mains Connection and Fuses

Mains Connection Examples: PD 2 R;PD 4 R (230 V)

Mains Connection Examples: PD 2 R;PD 4 R (400 V)

Mains Connection: PD 8 R (230 V;1~ to 220 V;3~)

Mains Connection: PD 8 R (230 V;1~ to 400 V;3~)

Mains Connection: PD 8 R;PD 12 R (220 V;3~)

Mains Connection: PD 8 R;PD 12 R (220 V;3~ CEE)

Mains Connection: PD 8 R;PD 12 R (400 V;3~)

Lauda PD 4 R Specifications

General IconGeneral
BrandLauda
ModelPD 4 R
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals