Fast guide. Instructions for the user -EN-
rev 03 - 03/2016 - cod. WY02000580
LB4200 coee - coee
Preparation of the water tank
• Turnthekeyandopenthetankdoor(1);
• extractthetankfromitshousing;
• carefullywashthetankwithlukewarmwater;
• installthenewlter(A);
• llthetankwithpotablewater;
• properlyinsertthetankintotheseatandclose
thedoorwiththekey.
Forsubsequentfillingwithwater,itisnot
necessarytoremovethetankfromitsseat;
Coee delivery
• Putthecoffeecupunderthedispensing
spout;
• lifttheleveroftheunit(2)andinserta
LAVAZZABLUEpod;
• lowertheleveroftheunit;
• pressthedesireddosebutton(e.g.
):
andwaitforcoeetobedelivered(theLED
comeson);
• tostopthedeliveryofcoffeeinadvance,
pressthedeliverybuttonagain(e.g.
)
or ;
Incaseofuseofsmallcups,thecupraising
grilleisavailable(14).
Dispensing hot water
• Placethejugunderthehotwaternozzle(7);
• turnthetapknob(4)counterclockwise:the
hotwatercomingoutwillbeproportionalto
theopeningofthetap;
• tointerruptthesteamdispensingturnthe
knobcounter-clockwise(4).
Steam dispensing
• Immergethesteamnozzle(8)intheliquid
tobeheated;
• turnthetapknob(3)counterclockwise:the
hotsteamcomingoutwillbeproportionalto
theopeningofthetap;
• tointerruptthesteamdispensingturnthe
knobcounter-clockwise(3).
Foroptimalfoaming,itisrecommendedto
observethefollowingsimplerules:
• Heatonlytheamountofmilkthatyouintend
touse(DONOTusealreadyheatedmilk
severaltimes);
• themilktobefoamedmusthaveastarting
temperatureof4°C.
Start-up
• Connectthemachinetothepowersupplyby
puggingthepowercord;
• TurntheswitchON(9);
• theautomaticllingofwaterintheboilerand
thedispenserunitheatingareactivatedwhen
themachineisswitchedon;
• whenthefillingofwaterintheboilerhas
finishedtheservicesboilerheatingphase
starts,indicatedbythesequentialashingof
theLEDsofthekeys;
• waitforthecoffeemachinetowarmup
completely,indicatedbythelightingofthe
LEDs(5).
• positionalargepitcherunderthespout;
• liftandlowertheleveroftheunit;
• afterdispensing5times,therstwashingstagewillend,theLEDofbutton(6)
keepsashing;
• checkthattheunitleverisclosed,
thenpressbutton(6)againwithin
10secondstostarttheprocess,the
correspondingLEDashes;
• pressbutton(6)again;
• waitfortheperformingoftherinse
indicatedbytheashingofbutton
(6)LED.
• attheendoftheprocedure,theboilertemperaturewillberestored(seeHeating
upthemachine).
Washing
Perform unit washing.
The led of button (6) of the unit that
requires the wash ashes quickly.
• pressandholdbutton(6)for5
seconds,thecorrespondingLED
goeso;
WASH PROGRAM
WASH PROGRAM
WASH PROGRAM
WASH PROGRAM
WASH PROGRAM
WASH PROGRAM
Heating up the machine
Flashing from LH to RH
Machine ready: all the LEDs are on.
WASH WASHSTOP
PROGRAM
STOP
PROGRAM
WASH WASHSTOP
PROGRAM
STOP
PROGRAM
A
1 2 2
4
7
5
3
8
9
1014
1 Long coee
2 Long coees
1 Medium coee
1 Espresso
2 Espressos
2 Medium coees
Continuous coee