Do you have a question about the LEGRAND 7 521 90 and is the answer not in the manual?
Instructions for creating a centralised control using connected and wireless roller shutter switches.
Ensure power is switched off at the main circuit breaker before installation.
Step to remove the current roller shutter switch from its mounting.
Instructions for wiring the new connected roller shutter switch.
Guidance on adding the product to your connected installation via user guide or app.