EasyManua.ls Logo

Lenze ECSEE020 - Page 161

Lenze ECSEE020
169 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Index 12
161
EDBCSXE040 EN 6.0
C
Cable cross−section, 54
Cable cross−sections, 39
Control connections, 42 , 50
Cable specification, 54
Cables, shielded, 39
CAN bus
assignment of the plug connectors, 53
bus status, 107
configuring, 95
control word, assignment, 105
cyclic process data objects, 85
synchronisation, 86
data telegram, 77
determining the master in the drive system, 100
display of telegram data, 107
display of the resulting identifiers, 99
event−controlled process data objects, 87
identifier, 77 , 94
Individual addressing, 98
making a reset node, 104
network management data, 78
Node Guarding, 102 , 119
parameter data, 78 , 88
parameter data channels, 88
parameter data objects, addressing, 94
process data, 78
process data objects, 82
addressing, 94
data transmission, 84
process data telegrams, 83
setting baud rate, 95
setting node address, 95
setting the boot−up time, 101
setting the cycle time, 101
setting the delay time, 101
setting the mode for process data transfer, 101
status words, assignment, 106
user data, 78 , 89
CAN data telegram, 77
CAN interface, 53
CAN network
communication phases, 79
network management (NMT), 81
state transitions, 80
states, 79
CAN user organisation CiA, Homepage, 78
Capacitor module, 9
Capacitor module ECSxK..., Connection, 47
CE−typical drive system, 33
assembly, 34
earthing, 35
filters, 34
installation , 33
shielding, 35
cables, 39
COB−ID, 94
Code list, 134
Collective cooler, ECSCE series power supply modules, 30
Commissioning, 55
after power−on, 67
basic settings
Chopper operation and short−circuit braking, 63
configuring the power supply enable input, 64
operation with external brake resistor, 66
setting the mains voltage, 62
STOP key of keypad XT, 65
Basic settings with GDC, 57
commissioning steps, overview, 56
Setting the operating mode, control via digital inputs, 60
setting the operating mode
operation via EtherCAT, 61
operation via system bus (CAN), 59
Communication
Bus−off, 118
cyclic node monitoring (Node Guarding), 102 , 119
monitoring, 118
monitoring times, 118
system bus (CAN) interface, 53
toggle bit monitoring, 119
Communication modules, 156
Communication phases, 79

Table of Contents

Related product manuals