EasyManua.ls Logo

Lexington Forge CSDV40DNV - VENT INSTALLATION; Horizontal Vent Installation Steps; Vent Opening Requirements; Installing Vinyl Siding Standoff

Default Icon
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
58D6056 17
HOT
HOT
VENT INSTALLATION
3. Attach vent pipe assembly to the stove. Set stove
in front of its permanent location to insure mini-
mum clearances. Mark the wall for a 9
1
/2" (241)
square hole (for noncombustible material such
as masonry block or concrete, a 7
1
/2" [190mm]
diameter hole is acceptable). See Figure 15.
The center of the hole should line up with the
center line of the horizontal rigid vent pipe.
Cut a 9
1
/2"x9
1
/2" (241mm X 241mm) square
hole through combustible exterior wall (7
1
/2"
[190mm] diameter hole if noncombustible).
Frame as necessary. See Figure 15.
4. Apply a bead of non-hardening mastic around the
outside edge of vent cap. Position the vent cap in
the center of the 7
1
/2" (190mm) or 9
1
/2" (241mm)
hole on the exterior wall with the word “UP” on
the vent cap facing up. Insure proper clearance
of 1" to combustibles is maintained. Attach the
vent cap with four wood screws supplied. See
Figure 16.
Do not recess vent termination
into any wall. This will cause a
re hazard.
WARNING
For vinyl siding, stucco, or wood exterior use vinyl siding standoffs
between vent cap and exterior wall. The vinyl siding standoff prevents
excessive heat from melting the vinyl siding material. Bolt the vent cap
to the standoff. Apply non-hardening mastic around outside edge of the
standoff instead of the vent cap assembly. Use wood screws provided
to attach the standoff. See Figure 17.
9
1
/2"
(241mm)
9
1
/2"
(241mm)
7
1
/2"
(190mm)
Figure 15 - Vent Opening Requirements
Figure 16 - Installing Horizontal Vent Cap
Vent Opening
Noncombustible Wall
Vent Opening
Combustible Wall
NOTE: Replace the wood screws with appropriate fasteners for
stucco, brick, concrete, or other types of siding.
HORIZONTAL VENT INSTALLATION (continued)
Figure 17 - Installing Vinyl Siding Standoff
Continued
Apply Mastic
to All Four
Sides
Vent Cap
Wood
Screw
Cut Vinyl
Siding Away to
Fit Standoff
Wood
Screw
Vent Cap
Bolt
Apply Mastic
to All Four
Sides
Nut
Standoff

Related product manuals