EasyManua.ls Logo

LG AP-Z Series - Page 33

LG AP-Z Series
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service Manual 33
3-way valve
2) Balance refrigerant of the 3-way valve
(Gas leakage)
Procedure
(1) Confirm that both the liquid side and gas side
valves are set to the back seat.
(2) Connect the charge set to the 3-way valves
port.
Leave the valve on the charge set closed.
Connect the charge hose to the service port.
(3) Open the valve (Lo side) on the charge set
and discharge the refrigerant until the gauge
indicates 0 kg/cm
2
G.
If there is no air in the refrigerant cycle (the
pressure when the air conditioner is not run-
ning is higher than 1 kg/cm
2
G), discharge the
refrigerant until the gauge indicates 0.5 to 1
kg/cm
2
G. if this is the case, it will not be neces-
sary to apply a evacuatin.
Discharge the refrigerant gradually; if it is dis-
charged too suddenly, the refrigeration oil will
also be discharged.
Lo
Open
Open
3-Way
valve
3-Way
valve
Gas side
CLOSEOPEN
Outdoor unit
Liquid side
Indoor unit

Other manuals for LG AP-Z Series

Related product manuals