EasyManua.ls Logo

LG ARNU 4 Series - Drainage Check and Piping Setup

LG ARNU 4 Series
29 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
INSTALLATION
ENGLISH
Type 'C' screw
Finishing the indoor unit
installation
1 Mount the tubing holder in the original
position.
2 Ensure that the hooks are properly seated
on the installation plate by moving it left
and right.
3 Press the lower left and right sides of the
unit against the installation plate until the
hooks engage into their slots (clicking
sound).
4 Finish the assembly by screwing the unit
to the installation plate by using two
pieces of type "C" screws. And assemble a
chassis cover.
Checking the Drainage
To check the drainage
1 Pour a glass of water on the evaporator.
2 Ensure the water flows through the drain
hose of the indoor unit without any
leakage and goes out the drain exit.
Drain piping
1 The drain hose should point downward for
easy drain flow.
Drain pan
Drain
hose
Leakage
checking
Connecting area
drain hose
Leakage
checking
Downward slope
1,MFL69485426,영영 2018. 1. 19. 영영 1:17 Page 16

Related product manuals