EasyManua.ls Logo

LG ARUM096BTE5 - User Manual

LG ARUM096BTE5
184 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
INSTALLATION MANUAL
Variable Refrigerant Flow Outdoor Units
6.0 to 42.0 Tons

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the LG ARUM096BTE5 and is the answer not in the manual?

Summary

Safety Precautions

INSTALLATION

Covers safety precautions related to the installation process.

PLACEMENT CONSIDERATIONS

Selecting the Best Location for the Outdoor Unit(s)

Criteria for choosing an optimal outdoor unit location.

Installing Outdoor Units Indoors

Guidelines for indoor installation of outdoor units.

Installing and Setting Outdoor Units in Dual; Triple Frame Systems

Procedures for installing and configuring multi-frame systems.

MOUNTING; ANCHORING THE OUTDOOR UNIT(S)

Mounting; Anchoring the Outdoor Unit(s)

Instructions for securely mounting outdoor units.

General Refrigerant Piping System Information

REFRIGERANT SAFETY STANDARDS; DEVICE CONNECTION LIMITATIONS

Outlines safety standards and connection limits for refrigerant systems.

FLARING AND BRAZING PROCEDURES

Flaring Procedure

Step-by-step guide for correctly flaring refrigerant pipes.

INSTALLING FOR HEAT PUMP OPERATION

Indoor Unit Y-Branch Kits

Details on using Y-branch kits for indoor unit refrigerant distribution.

INSTALLING FOR HEAT RECOVERY OPERATION

Outdoor Unit Y-Branches

Guidelines for installing outdoor unit Y-branches.

Header Kits

Information on using header kits for heat recovery systems.

Piping Connections; Pipe Routes

Explains heat recovery piping connections and routes.

Y-Branch Kits

Details on using Y-branch kits for heat recovery systems.

Heat Recovery Units

Specifications for heat recovery units.

INSULATION

Refrigerant Piping System Insulation

Requirements for insulating refrigerant piping for safety and performance.

ELECTRICAL

General Information

General warnings and guidelines for electrical installation.

Power Supply; Power Wiring Specifications

Details voltage and wiring requirements for power supply.

Power Wiring and Communication Cable Terminations

Procedures for terminating power and communication cables.

PRE-COMMISSIONING

Triple Leak; Pressure Check

Procedure for performing a triple leak and pressure test.

Triple Evacuation Procedure

Steps for evacuating the refrigerant system.

Pre-commissioning Start; Outdoor Unit DIP Switch Settings

Initial setup and DIP switch configuration for outdoor units.

MAINTENANCE RECOMMENDATIONS

PRE-COMMISSIONING CHECKLIST Page 1

PRE-COMMISSIONING CHECKLIST Page 2

COMMISSIONING NOTES

COMMISSIONING CHECKLIST EXCEPTION REPORT

Summary

Safety Precautions

INSTALLATION

Covers safety precautions related to the installation process.

PLACEMENT CONSIDERATIONS

Selecting the Best Location for the Outdoor Unit(s)

Criteria for choosing an optimal outdoor unit location.

Installing Outdoor Units Indoors

Guidelines for indoor installation of outdoor units.

Installing and Setting Outdoor Units in Dual; Triple Frame Systems

Procedures for installing and configuring multi-frame systems.

MOUNTING; ANCHORING THE OUTDOOR UNIT(S)

Mounting; Anchoring the Outdoor Unit(s)

Instructions for securely mounting outdoor units.

General Refrigerant Piping System Information

REFRIGERANT SAFETY STANDARDS; DEVICE CONNECTION LIMITATIONS

Outlines safety standards and connection limits for refrigerant systems.

FLARING AND BRAZING PROCEDURES

Flaring Procedure

Step-by-step guide for correctly flaring refrigerant pipes.

INSTALLING FOR HEAT PUMP OPERATION

Indoor Unit Y-Branch Kits

Details on using Y-branch kits for indoor unit refrigerant distribution.

INSTALLING FOR HEAT RECOVERY OPERATION

Outdoor Unit Y-Branches

Guidelines for installing outdoor unit Y-branches.

Header Kits

Information on using header kits for heat recovery systems.

Piping Connections; Pipe Routes

Explains heat recovery piping connections and routes.

Y-Branch Kits

Details on using Y-branch kits for heat recovery systems.

Heat Recovery Units

Specifications for heat recovery units.

INSULATION

Refrigerant Piping System Insulation

Requirements for insulating refrigerant piping for safety and performance.

ELECTRICAL

General Information

General warnings and guidelines for electrical installation.

Power Supply; Power Wiring Specifications

Details voltage and wiring requirements for power supply.

Power Wiring and Communication Cable Terminations

Procedures for terminating power and communication cables.

PRE-COMMISSIONING

Triple Leak; Pressure Check

Procedure for performing a triple leak and pressure test.

Triple Evacuation Procedure

Steps for evacuating the refrigerant system.

Pre-commissioning Start; Outdoor Unit DIP Switch Settings

Initial setup and DIP switch configuration for outdoor units.

MAINTENANCE RECOMMENDATIONS

PRE-COMMISSIONING CHECKLIST Page 1

PRE-COMMISSIONING CHECKLIST Page 2

COMMISSIONING NOTES

COMMISSIONING CHECKLIST EXCEPTION REPORT

LG ARUM096BTE5 Specifications

General IconGeneral
BrandLG
ModelARUM096BTE5
CategoryAir Conditioner
LanguageEnglish

Related product manuals