EasyManua.ls Logo

LG AUUH728C - Installation Parts Provided

LG AUUH728C
174 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
32 Synchro Air Conditioner
Installation
Ceiling & Floor(Convertible) Type
Please read this instruction sheet completely before installing the product.
When the power cord is damaged, replacement work shall be performed by authorized personnel only.
Installation work must be performed in accordance with the national wiring standards by authorized personnel only.
1
1-1
2
3
4
(Ceiling/Wall Mounting)
(Floor Mounting)
7
6
5
Required Parts Required Tools
Installation Plate
Four Type A screws
Connecting cable
Level
Screw driver
Electric drill
Hole core drill (ø70mm)
Pipes: Gas side ..........Ø9.52, Ø12.7, Ø15.88mm
Liquid side.............................................Ø6.35mm
Insulated drain hose
Insulation materials
Flaring Tools set
Specified Torque Wrenches
1.8kg·m...........................Liquid side piping
5.5kg·m .............................Gas side piping
Spanner .....................................Half union
Specified Torque Wrenches
1.8kg·m...........................Liquid side piping
5.5kg·m..............................Gas side piping
Hexagonal Wrench (4mm)
Gas-leak Detector
Two type B screws Owners Manual
Thermometer
Installation Plate (VB, 2pcs)
-1 Installation Plate (VE, 1pc)
Washer Bolt (M8 L25, 4pcs, type "A")
Floor Mount Bracket (1pcs)
Drain Hose, Insulated
Drain Hose Hanger and screw
Suspension Bolt
Bolts for Mount Bracket
Connecting Tube(mm)
Gas side : Ø12.7, Ø15.88
Liquid side : Ø6.35
Connecting Cable
Drain Hose Extended
Installation Parts Provided
The other Installation Parts Needed

Related product manuals