EasyManua.ls Logo

LG AUUQ54GH1 - Page 59

LG AUUQ54GH1
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Part 4 Trouble Shooting
- 59 -
Copyright ©2013 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
n AUUQ36GH1 / ATNQ36GMLE3
ABNQ36GGLA0 / AVNQ36GKLA0
Y^ Y] Y\ Y[ YZ YY YX
w ~ } | u u u
zwtZ
LED02M
LED01M
U
V
W
1. Wait until inverter PCB DC voltage is discharged after main power off.
2. Pull out V, V, W COMP connector.
3. Set multi tester to resistance mode.
4.
If the value between P and N terminal of IPM is short(0Ω) or open(hundreds MΩ), PCB needs to be replaced.(IPM damaged)
5. Set the multi tester to diode mode.
6. In case measured value is different from the table, PCB needs to be replaced.(PCB damaged).
27 26 25 24 23 22 21
P W V U Nw Nv Nu P W V U Nw Nv Nu
0.4 ~ 0.6 V
27 26 25 24 23 22 21
0.4 ~ 0.6 V
PFC_IPM check
U, V, W ‘ R S T

Table of Contents

Other manuals for LG AUUQ54GH1

Related product manuals