2. Indoor unit installation
■ Installation of Unit
Install the unit above the ceiling correctly.
• Apply a joint-canvas between the unit and
duct to absorb unnecessary vibration.
• Apply a filter Accessory at air return hole.
• Install the unit leaning to a drainage hole
side as a figure for easy water drainage.
• A place where the unit will be leveled and
that can support the weight of the unit.
• A place where the unit can withstand its
vibration.
• A place where service can be easily
performed.
5
CASE 1
POSITION OF SUSPENSION BOLT
CASE 2
POSITION OF CONSOLE BOLT
(Unit:mm)
A B C D E F (G) H I
18K BTU/h
932 880 355 45.5 450 30 87 750 163
24K BTU/h
932 880 355 45.5 450 30 87 750 163
36K BTU/h
1232 1182 355 45.5 450 30 87 830 186
48K BTU/h
1292 1230 570.5 54 680 30 120 1006 294
60K BTU/h
1292 1230 570.5 54 680 30 120 1006 294
Dimension
Capacity