- 54 -
4
1-. Execute TEST MODE #2.
2-. Check voltage between black wires.
No Checking flow Result & SVC Action
Result SVC Action
110~120VAC Go to step #6
0~10VAC Go to step #5
5
1-. Unplug Defrost Controller Assembly.
2-. Check continuity between Brown and
Red wires
Result SVC Action
0Ù Go to step #6
Open Circuit Replace Defrost Controller Assembly
6
1-. Unplug Defrost Heater,
2-. Check resistance value between
black wires.
Result SVC Action
32.7~36.1Ù Replace Defrost Controller Assembly
Other Value Replace Defrost Heater