No. Installation Parts, Tools Use
1 Flaring tool (Ø 6,35 - Ø 19,05) Flaring the pipes
2 Reamer Remove burrs from cut edges of pipes.
3 Pipe cutter (Max 35mm Copper pipe) Cutting the pipings
4 Wrench (H5, H4 hexagonal wrench) To open the service valve
5 Pipe bender Bending the pipings
6 Leak detector
Check the gas-leakage of connecting part of the pipings
7 Manifold gauge To measure the pressure, to charge the refrigerant
8 Charge-nipple To connect the bombe
9 Vacuum pump To remove the air in the pipe.
10 Charge cylinder balance To measure the refrigerant amount
11 Bombe (Freon-22) Gas charge
Air purge
Cleaning the pipe
12 Spanner To tighten the connecting parts of the pipings
13 Monkey spanner
14 Driver( , )
15 Benchi (150mm) Cutting the wires
16 Tapeline To measure the length
17 Core drill To make holes through the concrete to wall and blocks
18 Voltmeter, Amperemeter, Clampmeter To measure the current and voltage
19 Insulation resistance tester To measure the insulation resistance
20 Glass thermometer To measure the intake and outlet air temperature of
the indoor unit
21 Copper tubes To use the connecting pipings
22 Insulation material To cover the connecting pipings
23 Tape To finish the connecting pipings
24 Electrical leakage Breaker To shut off the main power
25 Cable To connect the cable from outdoor unit to indoor unit
26 Drain hose sockets, elbows To remote the condensing water