EasyManua.ls Logo

LG LP-E5020CL - Connecting Pipings and the Cable to Outdoor Unit

LG LP-E5020CL
79 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.5 Connecting Pipings and the cable to Outdoor unit
1) Connecting the pipings to the outdoor unit .
¥LAlign the center of the pipings and sufficiently tighten
the flare nut with fingers.
¥MFinally tighten the flare nut with torque wrench until
the wrench clicks.
• When tightening the flare nut with torque wrench,
ensure the direction for tightening follows the arrow
on the wrench.
2) Connecting the cables to the outdoor unit
31
Gas side piping
Liquid side piping
Torque wrench
Outdoor unit
Pipe Size Torque
3/8" 4.2 Kg
.
m
3/4" 6.5 Kg
.
m
¤ Open the control board cover from the outdoor unit
by removing the screws.
¤ØSecure the cable onto the control board with
clamp.
¤ŒSecure the control board cover to the original
position with the screws.
¤ŁConnect wires to the terminals on the control board
individually.

Related product manuals