9. Deice Control
ƒU Deicing operation is controlled by timer and sensing the indoor pipe temperature.
ƒU Deicing operation checks the indoor pipe temperature and Intake-air temperature at 25 minutes and 60 min-
utes on starting of heating operation, and discriminates by temperature difference.
ƒU When the heating operation passed 25 minutes, the temperature (¡ T1=TE1–TR1) is checked and memorized
with checking the indoor pipe temperture (TE1) and the indoor Intake-air temperature (TR1).
ƒU When the heating operation passed 60 minutes, deicing operation checks the indoor pipe temperature (TE2)
and the indoor Intake-air temperature (TR2), and checks the temperature difference (¡ T2=TE2–TR2) and the
temperature difference ¡ Td(=¡ T1–¡ T2) of ¡ T1, ¡ T2.
If the temperature difference (¡ Td) become more than the option temperature, deicing operation starts.
ƒU At that time, deicing operation time is decided.
ƒU The deicing operation time stops after deicing operation started.
ƒU If deicing operation start, above heating operation time is reset, so if deicing operation is finished, the heating
operation time is recounted.
ƒU The deicinig time and the operation diagram are as following.
ƒ¡19ƒ¡