EasyManua.ls Logo

LG LUU429HV - User Manual

LG LUU429HV
23 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
INSTALLATION MANUAL
Standard Inverter
AIR
CONDITIONER
Please read this installation manual completely before installing the product.
Installation work must be performed in accordance with the national wiring
standards by authorized personnel only.
Please retain this installation manual for future reference after reading it
thoroughly.
MFL68061228
Rev.00_013119
http://www.lghvac.com
www.lg.com
Copyright © 2017 - 2019 LG Electronics Inc. All Rights Reserved.
ENGLISH
FRANÇAIS
ESPAÑOL
Question and Answer IconNeed help?

Do you have a question about the LG LUU429HV and is the answer not in the manual?

Summary

Tips for Saving Energy

Important Safety Instructions

Installation of Outdoor Unit

Installation Places

Guidelines for selecting appropriate locations for the outdoor unit, considering sunlight, obstacles, and noise.

Piping Length and Elevation

Specifications for piping length, elevation, and refrigerant charging based on model capacity.

Wiring Connection

Electrical Wiring

Requirements for electrical wiring, power source, ELCB, and circuit breaker recommendations.

Connecting Cables Between Indoor and Outdoor Units

Instructions and diagrams for connecting cables between indoor and outdoor units, including cautions.

Connecting Copper Pipes

Piping Preparation and Flaring

Steps for preparing pipes, removing burrs, placing nuts, and performing flaring work.

Flaring Work Quality Check

Inspecting flared sections for defects to ensure proper sealing and prevent leaks.

Plumbing Materials and Storage

Guidelines for selecting pipe material, ensuring low impurities, and storing pipes to prevent damage.

Connecting Pipes to Outdoor Unit

Steps for aligning piping, tightening flare nuts by hand and with a torque wrench.

Preventing Foreign Objects from Entering

How to plug pipe through-holes with putty or insulation to prevent entry of foreign objects.

Forming the Piping

Instructions for wrapping the connecting portion of the indoor unit with insulation and tape.

Leakage Test and Evacuation

Preparation for Leakage Test

Checking connections, wiring, and service valve positions before leakage test.

Leakage Testing Procedure

Pressurizing the system with nitrogen gas and testing for leaks using soap.

Evacuation Process

Connecting vacuum pump, confirming valve positions, and running the pump to evacuate tubing and indoor unit.

Finishing the Job

Opening service valves, releasing pressure, and securing connections to prevent leakage.

Test Running

Test Running Precautions

Warnings about initial power supply voltage and carrying out cooling operation first.

Installation Completion Checks

List of items to measure and check after installation, including performance and physical condition.

Performance Evaluation

Measuring intake and discharge air temperatures to ensure proper cooling or heating performance.

Power Supply and Operation

How to connect the power supply cord and circuit breaker, and operate the unit.

Customer Handover

Instructing the customer on operation and maintenance procedures.

Function

Pump Down Procedure

Setting DIP switches and procedures for the pump down operation to recover refrigerant.

Self-Diagnosis Function

Outdoor Error Indicators

Explanation of outdoor unit error codes indicated by LED patterns (Red and Green).

DIP Switch Settings

Guide to setting DIP switches for various functions like Normal Operation, Pump Down, and Mode Lock.

Installation Guide at the Seaside

Selecting Outdoor Unit Location

Advice on choosing an outdoor unit location near the seaside to avoid direct sea wind and corrosion.

Warranty and Service Information

LG LUU429HV Specifications

General IconGeneral
BrandLG
ModelLUU429HV
CategoryAir Conditioner
LanguageEnglish

Related product manuals