EasyManua.ls Logo

LG Multi V PRHR022A

LG Multi V PRHR022A
61 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
INSTALLATION MANUAL
AIR
CONDITIONER
Please read this installation manual completely before installing the product.
Installation work must be performed in accordance with the national wiring standards
by authorized personnel only.
Please retain this installation manual for future reference after reading it thoroughly.
For Heat Pump / Heat Recovery system
Or
iginal instruction
MFL68980308
Rev.03_051320
www.lghvac.com
www.lg.com
Copyright © 2016 - 2020 LG Electronics Inc. All Rights Reserved.
ENGLISH
FRANÇAIS
ESPAÑOL
Question and Answer IconNeed help?

Do you have a question about the LG Multi V PRHR022A and is the answer not in the manual?

LG Multi V PRHR022A Specifications

General IconGeneral
BrandLG
ModelMulti V PRHR022A
CategoryAir Conditioner
LanguageEnglish

Summary

IMPORTANT SAFETY INSTRUCTIONS

INSTALLATION PROCESS

INSTALLATION

Preparation of Piping

Instructions for preparing piping work for gas leakage prevention.

REFRIGERANT PIPING INSTALLATION

Precautions on Pipe connection Valve operation

Essential safety and operational precautions for pipe connections and valve operations.

Installation procedure for HR unit

Step-by-step guide for installing the Heat Recovery (HR) unit.

Installation of Zoning Control

Instructions for installing zoning control for connecting indoor units to HR units.

Installation of Outdoor Unit, HR Unit, Indoor Unit Refrigerant Pipe

Details on connecting refrigerant pipes between outdoor, HR, and indoor units.

CAUTION FOR REFRIGERANT LEAK

PIPE CONNECTIONS BETWEEN INDOOR AND OUTDOOR UNIT

Preparation Work

Essential preparation steps before connecting indoor and outdoor unit pipes.

Refrigerant piping system

Pipe Connection Method between outdoor unitindoor unit

Pipe Connection MethodPrecautions for Series connections between Outdoor units

Refrigerant charging

Branch pipe Fitting

Guidance on fittings for branch pipes, including Y-branch and Header types.

Vacuum Mode

Leak Test and Vacuum drying

ELECTRICAL WIRING

Control box and connecting position of wiring

Details on control box wiring and connection points.

Wiring of main power supply and equipment capacity

Guidance on main power supply wiring and capacity considerations.

Example) Connection of power and communication cable (UXA)

Detailed wiring example for power and communication cables (UXA model).

Communication and Power Cables

Information on communication and power cable types, specifications, and usage.

Field Wiring

Specific wiring examples for field installations.

Example) Connection of power and communication cable (UXB)

Detailed wiring example for power and communication cables (UXB model).

Setting For Heat Recovery Unit (Refer Only Heat Recovery Installation)

Selection of the method for addressing valves of an HR unit (AutoManual)

Guidance on selecting auto or manual addressing for HR unit valves.

Setting the zoning control

Instructions for setting up zoning control for HR units.

Selection of the method for pipe detection

Details on selecting the method for pipe detection in HR units.

Setting the Zoning Control

Instructions for setting the zoning control for HR units.

Setting the Valve Group.

Automatic Addressing

The Procedure of Automatic Addressing

Flow chart of auto pipe detection Process

Flow chart of manual addressing for pipe detection

Self-Diagnosis Function

Outdoor unit related error

Related product manuals