EasyManua.ls Logo

LG Therma V AHUW096A2 User Manual

LG Therma V AHUW096A2
97 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
www.lg.com
Air-to-Water Heat Pump
Please read this installation manual completely before installing the product.
Installation work must be performed in accordance with the national wiring
standards by authorized personnel only.
Please retain this installation manual for future reference after reading it thoroughly.
INSTALLATION MANUAL
AIR
CONDITIONER
P/NO : MFL68681805
For more information, Refer to the CD or LG Web site (www.lg.com).
[
Representative
] LG Electronics Inc. EU Representative : LG Electronics European Shared
Service Center B.V. Krijgsman 1, 1186 DM Amstelveen, The Netherlands
[Manufacturer] LG Electronics Inc. Changwon 2nd factory 84, Wanam-ro, Seongsan-gu,
Changwon-si, Gyeongsangnam-do, KOREA
ENGLISH
ITALIANO
ESPAÑOL
FRANÇAIS
DEUTSCH
ΕΛΛΗΝΙΚΆ
ČEŠTINA
NEDERLANDS
POLSKI
LIMBA ROMÂNĂ

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the LG Therma V AHUW096A2 and is the answer not in the manual?

LG Therma V AHUW096A2 Specifications

General IconGeneral
TypeAir to Water Heat Pump
Cooling Capacity9.0 kW
Heating Capacity9.0 kW
Energy Efficiency ClassA++
RefrigerantR32
Power Supply220-240V, 50Hz, 1Ph

Summary

Safety Precautions

Installation Safety

Key safety instructions for installation, including electrical and grounding precautions.

Operation Safety

Important safety guidelines for operating the unit to prevent hazards.

Outdoor Unit Installation

Indoor Unit Installation

Piping and Wiring for Outdoor Unit

Refrigerant Piping Guidelines

Limits on refrigerant pipe length and elevation, with additional charge guidelines.

Pipe Preparation and Flaring

Detailed steps for preparing refrigerant pipes, including flaring techniques.

Connecting Refrigerant Pipes

Instructions for connecting refrigerant pipes to indoor and outdoor units.

Wiring Procedures

Step-by-step process for wiring power and connecting cables to the unit.

Leakage Test and Evacuation

Procedures for performing leakage tests and evacuating the refrigerant system.

Piping and Wiring for Indoor Unit

System Set-Up

Installer Setting Mode

Procedure for entering and configuring installer-specific settings.

Check Points, Maintenance, and Troubleshooting

Pre-Operation Checklist

Essential checks before starting the unit for the first time.

Maintenance and Test Run

Recommended periodic checks, maintenance tasks, and test run procedures.

Troubleshooting Common Problems

Solutions for common issues encountered during unit operation.

Troubleshooting Error Codes

Diagnosis and resolution for system errors indicated by specific error codes.

Related product manuals