EasyManua.ls Logo

LG UU85W - Pipe Drawing out

LG UU85W
37 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PIPE CONNECTIONS BETWEEN INDOOR AND OUTDOOR UNIT
19
ENGLISH
Remove leakage prevention cap
• Remove the leakage prevention cap attached to the outdoor unit service valve before pipe
work.
• Proceed the leakage prevention cap removal as follows:
- Verify whether the liquid/gas pipes are locked.
- Extract remaining refrigerant or air inside using the service port.
- Remove the leakage prevention cap
Service Port
Leakage Prevention Cap
Liquid pipe
Gas pipe
Pipe Drawing Out
Method of drawing out pipes on the front side and right side
- Proceed with the pipe work as shown in the below figure for front side and right side pipe draw-
ing out.
Pipe Knock Out for
Liquid/Gas pipes
Pictures may differ depending on the model.
1,MFL68645301(영) 2017. 6. 16. 영영 1:43 Page 19

Related product manuals