INSTALLATION MANUAL
AIR
CONDITIONER
www.lg.com
Please read this installation manual completely before installing the product.
Installation work must be performed in accordance with the national wiring
standards by authorized personnel only.
Please retain this installation manual for future reference after reading it thoroughly.
[
Representative
]
LG Electronics Inc. EU Representative : LG Electronics European Shared Service Center B.V.
Krijgsman 1, 1186 DM Amstelveen, The Netherlands
[
Manufacturer
]
LG Electronics Inc. Changwon 2nd factory 84, Wanam-ro, Seongsan-gu, Changwon-si,
Gyeongsangnam-do, KOREA
Single Inverter Outdoor Unit
Original instruction (R32)
Copyright © 2019 - 2020 LG Electronics Inc. All Rights Reserved.
ENGLISH
ITALIANO ESPAÑOL
FRANÇAIS DEUTSCH
ΕΛΛΗΝΙΚΆ
ČEŠTINA
NEDERLANDS
POLSKI
LIMBA ROMÂNĂ
Question and Answer IconNeed help?

Do you have a question about the LG UUA1 Series and is the answer not in the manual?

LG UUA1 Series Specifications

General IconGeneral
BrandLG
ModelUUA1 Series
CategoryAir Conditioner
LanguageEnglish

Summary

MODEL DESIGNATION

Product information

Details on product name and model designation breakdown.

Airborne Noise Emission

Information regarding the A-weighted sound pressure emission levels of the product.

TIPS FOR SAVING ENERGY

For your records

Section for users to record purchase details for warranty purposes.

IMPORTANT SAFETY INSTRUCTIONS

INSTALLATION

Installation Tools

Lists and illustrates the tools required for installation.

INSTALLATION OF OUTDOOR UNIT

Installation Places

Guidelines for selecting suitable locations for outdoor unit installation.

Piping length and the elevation

Specifications for piping length and elevation differences for single and compact operations.

Minimum floor area(for R32)

Details on required minimum floor area for installation, including graph and data tables.

Synchro Operation

Instructions for installing branch pipes in synchro operation to meet length and height specifications.

Refrigerant Additional Charging Method

Procedures and formulas for calculating additional refrigerant charge based on pipe length.

Synchro Combination table

Table showing possible combinations of indoor units for synchro operation.

Outdoor Unit PCB Setting Procedure For Simultaneous Operation System

Steps for setting the Outdoor Unit PCB and performing auto addressing for simultaneous operation.

CONNECTING PIPES

Preparation of Piping

Main causes of gas leakage and procedures for flaring work.

Burrs removal

Instructions on how to properly remove burrs from cut pipe ends.

Flaring work

Details on performing flaring work using a dedicated tool for R32.

Connection of piping - Outdoor

Steps for aligning and tightening flare nuts on outdoor unit piping connections.

Preventing foreign objects from entering

Guidance on sealing gaps to prevent entry of foreign objects into the outdoor unit.

Forming the piping

Methods for forming and securing indoor/outdoor unit piping with insulation and tape.

WIRING CONNECTION

Electrical Wiring

Guidelines for performing electrical wiring, compliance with local requirements, and ELCB usage.

Connecting Cables between Indoor Unit and Outdoor Unit

Instructions for connecting indoor and outdoor unit cables, matching wire colors and terminal numbers.

Simultaneous Operation Wiring

Wiring configurations for simultaneous operation systems, including unit types and remote controller connections.

Precautions when laying power wiring

Recommendations for using round pressure terminals and avoiding mixed wiring thicknesses for power connections.

Connecting the cable to Outdoor Unit

Steps for connecting the power cable to the outdoor unit, including earthing work.

LEAKAGE TEST AND EVACUATION

Preparation

Steps to check piping connections and service valves before leak testing.

Leakage test

Procedure for pressurizing the system with dry nitrogen and performing a bubble test for leaks.

Evacuation

Process of removing air and moisture from the system using a vacuum pump.

Finishing the job

Final steps for closing valves, removing hoses, and replacing valve caps.

TEST RUNNING

Precautions In Test Running

Important precautions before and during the test run procedure.

CHECK THE FOLLOWING ITEMS WHEN INSTALLATION IS COMPLETE

A checklist of items to verify after installation is complete, including measurements and appearance.

Evaluation of the performance

Method for evaluating performance by measuring intake and discharge air temperatures.

INSTALLATION PI485

FUNCTION

DIP S/W Setting

Guide to setting DIP switches on the PCB to configure various operational functions.

Pump Down

Procedure for executing the pump down function using DIP switches and valve operations.

Saving Power Consumption

Explanation of the Saving Power Consumption function and its setting procedure.

Night Quiet Mode

Description of the Night Quiet Mode function to reduce outdoor unit noise, and its setting.

Mode Lock

Procedure for setting the Mode Lock function to restrict operational modes.

INSTALLATION GUIDE AT THE SEASIDE

Selecting the location (Outdoor Unit)

Advice on selecting outdoor unit locations near the seaside to prevent corrosion from sea wind.

SEASONAL WIND AND CAUTIONS IN WINTER