EasyManua.ls Logo

Lifetime 60079 - Page 59

Lifetime 60079
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
59
TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS / INSTRUMENTAL Y HERRAJE REQUERIDOS
X SECTION 10 (CONTINUED) / SECTION 10 (SUITE) / SECCIÓN 10 (CONTINUACIÓN)
10.7
Repeat these steps for the rear Roof Panel, but only use one Roof Support for each Roof Panel (AGQ).
Répétez ces étapes pour le panneau de toit arrière, mais n’utilisez qu’un support de toit pour chaque panneau de toit (AGQ).
Repita estos pasos para el panel de tejado trasero, mas use sólo un soporte de tejado para cada panel de tejado (AGQ).
AGQ
10.8
• Now insert a second Roof Support (AFL) into the notches in the Gable and between the Truss and the Roof Panel as
shown. Then, insert the last two (2) Screws (ADZ) at the locations shown.
• Maintenant, mettez un deuxième support de toit (AFL) dans les
encoches dans le pignon et entre le panneau de toit et la ferme
comme illustré. Ensuite, insérez les dernières deux (2) vis (ADZ) aux
emplacements illustrés.
• Ahora, inserte un segundo soporte de tejado (AFL) en las muescas
en la fachada y entre la cercha y el panel de tejado como se
muestra. Entonces, introduzca los dos (2) últimos tornillos (ADZ) a las
ubicaciones ilustradas.
AFL
AFL
AFL
ADZ (x2)
ADZ (x13)

Related product manuals